Data Center Infrastructure. Installed. Cabled. Documented._
Equipment receiving and preparation, rack integration, burn-in, onsite deployment and lifecycle support for enterprise and GPU infrastructure. A defined physical work package, from equipment requirements to documented handoff.
Infrastructure Services_
Plan & Source
Translate equipment requirements into physical plans, receiving inputs and a preparation scope. Identify the appointed supplier, approved configuration and delivery responsibilities before assembly begins.
Rack assembly & preparation
Reconcile identified deliveries, prepare equipment and assemble the approved rack package with configuration, receiving and handoff records.
Explore Rack assembly & preparationPhysical planning & CAD
Discuss layouts, cable routes, point-to-point schedules, labels and material documentation; authoring capability and outputs are confirmed per engagement.
Explore Physical planning & CADBuild & Validate
Bring the physical build together before deployment. Rack assembly, pre-integration and hardware burn-in with an agreed test plan, traceable records and a clear disposition for exceptions.
Hardware burn-in & validation
Hardware QA against an agreed configuration, test plan, resources and acceptance criteria, with results and exceptions documented.
Explore Hardware burn-in & validationRack-and-stack installation
Install agreed enterprise or GPU equipment to approved rack positions, mounting instructions and reviewed handling conditions.
Explore Rack-and-stack installationStructured cabling & fiber
Install the agreed fiber and copper pathways, route and dress cables, identify endpoints and document the agreed physical installation.
Explore Structured cabling & fiberDeploy & Relocate
Connect the equipment to its destination. Onsite rack installation, structured cabling and physical relocation, coordinated around access, inventory, handling and site readiness.
Complete physical deployment
Connect receiving, rack integration, hardware QA, onsite deployment and cabling in one defined physical delivery package.
Explore Complete physical deploymentEquipment relocation
Coordinate equipment inventory, removal, handling, logistics, receiving and destination reinstallation within an agreed custody and site plan.
Explore Equipment relocationColocation installation
Coordinate customer-side rack and cabling work inside an authorized third-party facility; hosting and facility services remain with the provider.
Explore Colocation installationDSX POD Physical IT Installation Support
Scope the approved receiving, IT cabling, labels and physical handoff around a partner-supplied DSX POD project, with resources and specialist interfaces agreed per engagement.
Explore DSX POD Physical IT Installation SupportRefresh & Support
Schedule physical support, equipment replacement, recabling, remediation and refresh. Coordinate removal or decommissioning with assigned owners, revised records and a clear destination for each affected asset.
Hardware refresh & physical support
Carry out agreed physical remediation, equipment replacement and lifecycle work, with revised installation records, scope approval and assigned open items.
Explore Hardware refresh & physical supportPhysical Equipment De-Racking
Scope authorized physical equipment removal, identity and connection records, and the next handoff without assuming data destruction or destination reinstallation.
Explore Physical Equipment De-RackingNeed a defined measurement or inspection package? See physical verification and documentation. For liquid-side scope boundaries, read the cooling responsibility guide.
GPU Infrastructure Equipment Context_
H100
Hopper platform -- confirm the exact server and OEM installation requirements
View H100 Specs →H200
Hopper platform -- compatibility and upgrade paths depend on the supplied system
View H200 Specs →GH200
Grace Hopper systems -- physical interfaces follow the exact OEM configuration
View GH200 Specs →B200
Blackwell systems -- rack, cabling and facility inputs are configuration-specific
View B200 Specs →B300
Blackwell Ultra systems -- scope from current customer and OEM inputs
View B300 Specs →GB200 NVL72
NVL72 equipment context -- cooling systems belong to qualified external contractors
View GB200 NVL72 Specs →EQUIPMENT CONTEXTGB300 NVL72
Blackwell Ultra rack-scale systems -- physical installation follows OEM and site requirements
View GB300 NVL72 Specs →PLANNING CONTEXTRubin
Future-system planning -- verify current OEM availability and specifications
View Rubin Platform →Discuss Your Infrastructure Project_
Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.
Discuss a ProjectEmail Project Scope